RIVP Pilot 1 LIVE

Road Infrastructure Monitoring — Uppsala County

Pilot Overview

2
Roads Monitored
68
Total km
3
Changes Detected
85%
Avg Confidence

E4 (Motorway) — 45 km

Pothole Detected
Location: 59.85°N, 17.65°E | Size: 12 m² | Severity: Medium
Confidence: 82%
Construction Zone
Location: 59.88°N, 17.72°E | Size: 2,500 m² | Severity: High
Confidence: 95%
[Satellite imagery would show E4 with detected changes marked]

Länsväg 272 (County Road) — 23 km

Surface Damage
Location: 59.92°N, 17.55°E | Size: 45 m² | Severity: Low
Confidence: 78%
[Satellite imagery would show Länsväg 272 with detected change marked]

Data Sources

Methodology

  1. Download Sentinel-2 L2A images for target area
  2. Pre-process: atmospheric correction, cloud masking
  3. Extract road mask using OpenStreetMap vectors
  4. Compare spectral signatures before/after
  5. Classify change type using trained model
  6. Calculate confidence based on image quality and change size

Next Steps